Monday, July 15, 2013

Temporary Living

Initially, the travel trailer and motor home were parked near the machine shed. We recently positioned them in the shade around the yard. Now, with both campers opening into that yard, I can take advantage of its shade, grassy--not muddy--turf, and dust-free breeze. Plus, the view out the window shows nothing but nature.



In the mean time:





The heating coils are in and we wait patiently for the concrete folks to arrive and finish the preparation.


If all goes well, we will have a solid concrete floor tomorrow, or by the end of the week, weather permitting.


Tuesday, July 9, 2013

Rain

An email I sent to my sister:

"...and the skies opened up and the rains came down and down and down...The trailer doesn't leak, but it is rather noisy--a soothing, muffled drum of the "heavy at times". The trouble is, the "heavy at times" is beginning to feel like the norm. I wonder if the trailer floats--my own mini-ark. But, I didn't march the animals in two by two so how will I be able to send out a dove to let me know when it's all over?

So many things to ponder while not building a house!"

Maybe I will calculate the length of my floor joists so I can put in the order.

The plumber is coming tomorrow, Wednesday, to put in the heating pipes for the basement floor. I believe he said that we would be finished by the end of the day. Since he and concrete know each other quite well and work together often, they will work out the schedule for that part of the project.

And when we are finished with the concrete, I will need the floor joists.

2 1/2" x 9 1/2" x 22'  I-Joist

Sunday, July 7, 2013

More Pictures of Footings










Polystyrene

Under the concrete floor will be heat pipes, under the pipes will be two inches of extruded polystyrene. After years of calling this stuff styrofoam, I learn that Styrofoam is Dow Chemicals' brand name for their blue polystyrene. For this project, I am using Owens Corning's polystyrene, Foamular, which is pink.

                                                      Of course, these two piles came on a truck and were dropped here...

  but need to be there:



  This time, though, foam is light so two people can pick up each of the piles.


So, the sand has been leveled and the foam placed. Next will be the plumber with the heat pipes followed by the concrete, and then, we will have a basement floor.

Owens Corning Foamular
Notice the pattern--some people like patterns and symmetry. However, one area has the pattern at 90 degrees to the rest and a few smaller pieces follow no pattern at all because symmetry hidden under 5" of concrete is not worth $30 per sheet.

Nature is alive and well out here. Wood ticks join us any time we step too close to tall grass--wet spring tends to bring them out in force. The deer wander through frequently. Sometimes I think they're inspecting the project.

To keep us entertained, we have
our resident woodpecker.
In this case, checking out the old Allis Chalmers.

This is an interesting bird. But, what does pecking on the metal hood of a tractor do?  After leaving the tractor, I hear the tapping on an empty fuel barrel, then a metal building and finally a tree in the woods. Musical bird.

Incidentally, the weather has been mostly hot and dry. Working in 85 degree weather isn't bad if the humidity is low and there is a slight breeze, which is what we have been having. However, working in a white basement is another matter.

No breeze. The sun reflects off the white walls, raising the temp quite a bit. "Not to worry", he thinks, "the dirt floor absorbs a lot of that excess heat."

All I can say about that is it's a good thing I had help. A hired hand worked with me a couple days, then my sister came through for two more days. Couldn't have finished without them.

But, pink polystyrene reflects it all back to anyone in the oven basement...me! 

Some of Grandma's flowers are blooming:


And, I have a tomato:


Next, I hope to have a floor in the basement, and maybe the garage.


Monday, June 24, 2013

More Stub Walls and Sand to Move

Busy week (or two, or so). Working on the final four stub walls. When that is finished, the last of the back fill can be done.




Drain tile are in, sump bucket is placed, water and geothermal lines are run.













Now I need to order another yard or two of sand...

                                                                                                         ...actually ten yards, and here it is!...







...but, but, but...it needs to be here!






I have two good arms, but only one shovel! Oh well, so it will take a while.


As it turns out, my concrete guy, plumbing guy, and sand and gravel guy, are all retired (teaching, plumbing, sand and gravel). They see this retired solder and teacher in need of a little help, so they send a second  shovel. They even said I could drive it tonight if I want.



We might have concrete by the end of the week or early next week--Lord willing and the creek don't rise, that is.

I've been in touch with the floor joist folks. They are working up the order and cost for the next step. Electricity has been here and once the floor is poured and the basement capped, he will run electricity and internet to the house. Progress?

Tuesday, June 11, 2013

I'm Back

Back at the site. This year I was greeted by Grandma's lilacs in full bloom.

Lilacs west of where original house stood
South edge of the yard, notice the white flowers                
The white flowers and lilacs



Asparagus surrounded by weeds
The flowers from her garden survived, both those relocated and those left behind. No flowers yet, but the plants are looking healthy.

All is not well

We arrived ready to start assembling the domes.  We had been tipped of that the concrete had not been placed in the walls and foundation, yet, but that shouldn't take long.

When we arrived on site, all the walls and foundation were standing tall, waiting for concrete.

But then, upon a closer look and discussion...the sun set that day with the construction site looking like this:


We disassembled the garage the first day, then rebuilt it and began work repairing the link and finally the house. We poured the concrete in time for me to leave in mid August.