A week on the road visiting family in three states, delivering merchandise from folks back home. Finally, we reach our destination in mid May. And what do we hope to see? Our dome under construction; workers with their sleeves rolled up, happily going about their jobs in the warm breeze; the sun shining just right to properly cure the concrete, birds singing, flowers about to bloom, asparagus sticking its shoots up...you know, mid-May, spring time...

So, what was our welcoming party? Snow falling from a cloudy, dreary sky; cold wind blowing in from the western plain; workers bundled up like hunters in December; and our consultant ready to head back south! But, the project continues and I can see that there is a dome taking shape on the side of the hill.

Pictures will be posted as I get them.

Finally, our dome!  
Hmmm. Doesn't look right!

Maybe you should take a prezi stroll to see what's really happening. (It was very windy today, and so we have a lot of construction debris floating all over.)

Enjoy, but don't look for a cupola, it will be built this week, weather permitting.

Sunday, August 8, 2010

Finished!

Finished-and I won't get to see it until next summer *sigh*



Steve smoothened the floor on the inside and the aprons on the outside, and then took these pictures. The first is looking out the east, overhead door; the other is looking through the building from the west (notice the big sliding door)...



Finally, a picture of the east wall with the overhead door still open.
Now that I have a big, new machine shed, I should have a new machine or so to put in it. Right?


Day 9

Day 9


All the steel is on; all that's left is some trim, two pieces of the ridge vent, and the two big doors. Unfortunately, I need to leave-I have just enough time to get home, hug my wife, and head off to CMI/A 2010 in Saratoga Springs, NY.

Days 7 and 8

Day 7



The windows and walk-in door are installed and the building is now ready for steel.

Somehow, even with a steel door and high-security lock, I don't believe it's time to store anything of value in the here.
Day 8


The roof is covered and the north wall is almost finished.


















Days 5 and 6



Day 5:


More framing, though progress is not too noticeable; overhang is almost finished. All posts are in and some of the door and window work is done.



Day 6:

Time for steel. The soffit steel is fastened on under the overhang on the ends and under the eaves.