Sunday, August 8, 2010

Finished!

Finished-and I won't get to see it until next summer *sigh*



Steve smoothened the floor on the inside and the aprons on the outside, and then took these pictures. The first is looking out the east, overhead door; the other is looking through the building from the west (notice the big sliding door)...



Finally, a picture of the east wall with the overhead door still open.
Now that I have a big, new machine shed, I should have a new machine or so to put in it. Right?


Day 9

Day 9


All the steel is on; all that's left is some trim, two pieces of the ridge vent, and the two big doors. Unfortunately, I need to leave-I have just enough time to get home, hug my wife, and head off to CMI/A 2010 in Saratoga Springs, NY.

Days 7 and 8

Day 7



The windows and walk-in door are installed and the building is now ready for steel.

Somehow, even with a steel door and high-security lock, I don't believe it's time to store anything of value in the here.
Day 8


The roof is covered and the north wall is almost finished.


















Days 5 and 6



Day 5:


More framing, though progress is not too noticeable; overhang is almost finished. All posts are in and some of the door and window work is done.



Day 6:

Time for steel. The soffit steel is fastened on under the overhang on the ends and under the eaves.


Sunday, July 25, 2010

Storms



An ominous-looking sky above the western horizon. Minnesota had more tornadoes touch down that day than in any other day in recorded history. The high school in Wadena, (a town in central Minnesota) took a direct hit. Fortunately, it came after school let out for the summer and before the school reunion activities had begun. I don't believe anyone was hurt.
The gas station/convience store in Mentor, a town along US Highway 2 in the north-west part of the state, was also hit and totally destroyed. The owner threw himself on top of his daughter and and an employee, protecting them from the freezer that was knocked over. The daughter suffered minor cuts; the employee was taken to the hospital in serious condition; the owner, unfortunately, died from his injuries. The Dairy Queen across the street received no damage, not even a scratch.

Saturday, July 24, 2010

Days 3 and 4


Day 3, Wednesday. With the rafters in place, the posts for the east wall are now dug in.
The ruts got deeper and the rain that night filled them again.




Day 4, Thursday. All the main posts are in position and most of the wall girts are fastened on. Also, the purlins are on the roof, extending beyond the building to allow for the overhang that is to come.
The water-filled ruts became deeper and that night, even more rain fell, filling them once again. To allow for the site to dry out, no further work was done until the following Monday.









Days 1 and 2


With limited internet access on the farm this year, these pictures were not posted at the end of each day-as a matter of fact, they didn't get posted until after my return to Maryland, a week at the Curriculum Mapping Academies and Institute, and a couple days rest.

Day 1, Monday.
Posts are cemented in place for the side walls. One post hole required digging out a big rock before the hole could be dug deep enough.

It rained that evening.




Day 2, Tuesday. Wall girts are in place on two of the walls. Posts are placed on the west wall and are positioned to make room for the big door. Ruts are left from the skidsteer working on the wet ground.

More night-time rain filled the ruts.