Showing posts with label building in progress. Show all posts
Showing posts with label building in progress. Show all posts

Sunday, August 8, 2010

Day 9

Day 9


All the steel is on; all that's left is some trim, two pieces of the ridge vent, and the two big doors. Unfortunately, I need to leave-I have just enough time to get home, hug my wife, and head off to CMI/A 2010 in Saratoga Springs, NY.

Days 7 and 8

Day 7



The windows and walk-in door are installed and the building is now ready for steel.

Somehow, even with a steel door and high-security lock, I don't believe it's time to store anything of value in the here.
Day 8


The roof is covered and the north wall is almost finished.