Monday, May 5, 2014

Week Two

The High Profile Entry and one Standard Entries are taking shape. This picture offers a good view showing the difference between the High Profile and Standard Entries. The top of the Standard Entry on your right will be the floor of the balcony off the master bedroom.
High Profile and Standard Profile Entries photo by MKB
Photo by MKB
The Standard Entry on the left is the one under the balcony from the master bedroom. The two missing triangles will be window dormers, one for a bathroom, the other for an office/bedroom. On the right is the beginning of the walls for the link to the garage.

Photo by KK
 This pictures shows channels around the entries that take rebar and concrete not only for strength around the openings, but to add to the overall structural strength and integrity as well.



Photo by KK
All of the panels are installed around the entries.


Photo by KK


And, the week comes to a soggy end...with most of the next row of panels installed. The ground turned to mud in the rain, but work went on as much as possible.

1 comment:

  1. I don't know... that picture looks Photoshopped to me :)

    It's nice to be able to see people standing next to it. Gives me a good sense of scale!

    ReplyDelete