As the first week ends, things are starting to look up.
 |
| Photo by MKB |
This is the High Profile Entry--all the others are a bit shorter. The first day, the rectangular "riser panels" were placed and cemented in, then the temporary rib support system was built, followed by the next row of panels with its initial layer of cement inserted.
 |
| Photo by MKB |
The blue line shows where the top of this opening will be. The circle is at another entry that has panels projecting out from the dome. All entries will have these, they provide support against the outward forces of the sphere, they provide a flat, vertical wall in which to install doors and windows, and they offer overhead cover for those doors and windows.
Notice the difference in height between the Standard Entry and the High Profile Entry.
 |
| Photo by MKB |
This picture, taken by our consultant, shows the partially constructed Standard Entryway. Above it will be the balcony that opens into the master bedroom.
He says that on Monday, they will install the side and top panels for all the entryways, including the balcony.
 |
| Photo by MKB |
I will let you decide what manner of creature came by to inspect the goings on at the site. Where was it (and its mama) when the thieves broke in last winter and helped themselves to all of my tools, gas, batteries, etc.?
 |
| Photo by MKB |
If you want to know how big the foot is, this is a size 8 lady's foot.